Frenzied activity lately. The crane base has been installed behind those hoardings, and the rest of the site is extensively undergoing groundworks. Exciting times!

View feature View community

Exciting times at The Mercian (Moda Tower) - June 2019 update


Exciting times at The Mercian (Moda Tower) - June 2019 update


Frenzied activity lately. The crane base has been installed behind those hoardings, and the rest of the site is extensively undergoing groundworks. Exciting times!


dndimg alt="" dndsrc="../uploadedfiles/Construction of The Mercian (Moda Tower) - June 2019.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/Construction of The Mercian (Moda Tower) 2 - June 2019.jpg" style="width: 100%;" />

dndimg alt="" dndsrc="../uploadedfiles/Construction of The Mercian (Moda Tower) 3 - June 2019.jpg" style="width: 100%;" />

Pictures by dndimg alt="" dndsrc="https://www.yourplaceyourspace.net/peoplewithpassion/StephenGiles" />Stephen Giles

Project Overview

HEIGHT: 42 floors (132m) 
DEVELOPER: MODA Group
ARCHITECT: Glenn Howells Architects
CONTRACTOR: John Sisk and Son
USE: Residential

42 storey mixed use development, comprising of a thirty-nine storey resi building (30 studios, 163 one, 260 two & 28 three beds) constructed on top of a three-storey podium, with over 30,000 square foot of communal amenity space throughout.

Amenities will include the UK's first ever 200m running track on a habitable building, 24-hour concierge service, app controlled lifts, terraces, indoor/ outdoor cinema & dining club, offices, wellbeing zones, co-working space, gym, secure car and cycle parking & a cycle hub.

The development is being funded by a portfolio of investors, namely Apache Capital, Harrison Street Real Estate Capital, NFU Mutual and Goldman Sachs

dndimg alt="" dndsrc="../uploadedfiles/MODA Tower (2one2) Artists Impressions.png" style="width: 100%;" />Artists impression from Glenn Howells Architects