The 1960s-built The Ringway Centre is to be reimagined with a three phase residential-led, mixed-use development comprising up to 1750 new homes in buildings ranging from 44 to 56-storeys.

View feature View community

Three Builds of 44, 48 & 56-storeys Earmarked for Smallbrook Queensway


Three Builds of 44, 48 & 56-storeys Earmarked for Smallbrook Queensway


The 1960s-built The Ringway Centre is to be reimagined with a three phase residential-led, mixed-use development comprising up to 1750 new homes in buildings ranging from 44 to 56-storeys.


dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq17.jpg" />

 

Brought forward by CEG on behalf of Dooba Investments II Ltd, hybrid plans have been lodged (full & outline) that will see the site fully redeveloped to breathe new life into a vital part of Birmingham city centre.

A modernist favourite, the tired buildings however are widely seen as a physical barrier between two vibrant parts of the ever-evolving city.

SBQ aims to fully reinvent and reconnect itself with the city by delivering the demand for new city centre 1-3 bed apartments and unlocking existing disconnected areas with the provision of new vibrant ground-level uses.

A comprehensive public realm strategy will also be implemented, helping to green the city's core and enhance ties with the nearby Chinese Quarter, Gay Village, the emerging Smithfield district, and unlock development sites next door.

THE PLANS:

Phase 1 (closest to Bullring): Full plans include a 48-storey building accommodating 571 Build to Rent (BTR) apartments, sat above an eclectic array of lower-level retail, commercial, and leisure uses.

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq22.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq9.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq16.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq8.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq21.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq23.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq15.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq4.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq18.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/SBQ%20Phasing%201.jpg" />

Subsequent phases: Two further buildings of 44 (SBQ1) & 56-storeys (SBQ2) are also earmarked, coupled with demolition works, and are being brought forward under outline plans. Both will accommodate well over 1000 new homes, complemented by high quality commercial & leisure uses.

An all-electric affair that will incorporate renewable sources to achieve high standards of energy efficiency, SBQ will undoubtedly act as a catalyst for future development and investment in the area, providing a more aesthetic environment.

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq28.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq3.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq24.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq20.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq2.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq26.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq27.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq14.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq12.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq11.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq10.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq9.jpg" />

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/sbq6.jpg" />

Words by Stephen Giles; all images are the property of Corstorphine+Wright.

dndimg dndsrc="https://www.freetimepays.com/uploadedfiles/13240532185_6867b6ac45_o.jpg" />

2014 image from Mac McCreery.